• High - pressure metering cabinet
  • Metering cabinet, the cabinet with a special meter (device) installed, is called a metering cabinet. In China, the metering cabinet generally refers to the electric energy metering cabinet, according to the definition of terms in the specification "Electric Energy Metering Cabinet" (GB/T 16934-2013), the electric energy metering cabinet: a special cabinet type of electricity metering device (electric energy metering device). Electricity metering device: A general term for the combination of all electrical equipment, electrical parts and mechanical structures that measure electric energy.

      First, the configuration of the metering cabinet

      Users of power supply of 10kV and below should be equipped with a national unified standard electric energy metering cabinet (box). Users with 35 kV power supply should be equipped with a national unified standard electric energy metering cabinet (box).

      Second, the measurement of security measures

      The connecting parts of the measuring cabinet (box) and the secondary circuit must be able to reliably install seals, and the design of the sealing parts is scientific and reasonable, leaving no gaps; For the old metering device, the technical transformation should be gradually carried out on the premise of ensuring the measurement safety measures.

      3. Selection and configuration of transformer

      1. The metering cabinet (box) must be equipped with a special current transformer.

      2. It is not advisable to use multi-tap variable ratio current transformer.

      3. The relay protection and ammeter of the inlet cabinet should be equipped with a separate current transformer.

      4. The determination of the rated primary current of the current transformer should ensure that the actual load current in normal operation reaches about 60% of the rated value, and at least not less than 30%.

      5. The determination of the rated secondary load of the special transformer should ensure that the actual secondary load is within the range of 25%-100% rated secondary load.

      Fourth, the measurement accuracy level configuration

      1. High-voltage billing users with an average monthly electricity consumption of 5 million KwH and above, or high-voltage billing users with a transformer capacity of 10,000 KVA and above, must be equipped with 0.2 s current transformers; Class 0.2 voltage transformer; 0.2 S or 0.5 S class energy meter.

      2. High-voltage billing users with an average monthly electricity consumption of 1 million kWh and above, or high-voltage billing users with a transformer capacity of 2000kVA and above, must be equipped with a 0.2 s current transformer, a 0.2 voltage transformer, and a 0.5 s or 0.5 level electric energy meter.

      3. Billing users with an average monthly electricity consumption of 100,000 kWh and above, or billing users with a transformer capacity of 315 kVA and above, must be equipped with a 0.5 s current transformer, a 0.5 voltage transformer, and a 1.0 level electric energy meter.

      4. Billing users, three-phase low-force users, and single-phase users with transformer capacity below 315 kVA should be equipped with 0.5 S level current transformer and 2.0 level electric energy meter.

      Fifth, the measurement of the secondary circuit

      1. The secondary circuit of the voltage transformer in the charging energy metering device of 35 kV and below shall not be equipped with the auxiliary contact and fuse of the isolation switch.

      2. The electric energy metering device must be equipped with a joint junction box, and the secondary circuit of the voltage transformer should be directly connected to the electric energy meter through the joint junction box, and shall not be connected through the terminal bar.

      3. The connecting wire from the secondary outlet terminal of the transformer to the inlet terminal of the joint junction box shall be made of copper single-core insulated wire; A, B, C phase wires and neutral wires are distinguished by yellow, green, red and two-color wires respectively, and must be wired in phase order.

      4. The two ends of the connecting wire from the secondary outlet terminal of the transformer to the joint junction box should be numbered, and the handwriting should be clear and durable.

      5. For the current secondary circuit, the cross-sectional area of the connecting wire should be calculated and determined according to the rated secondary load of the current transformer, and should not be less than 4mm2. For the voltage secondary circuit, the cross-sectional area of the connecting wire shall be determined according to the calculation of the allowable voltage drop, and shall not be less than 2.5mm2.

      6. The length of the secondary wire from the transformer to the joint junction box should be left in the form of coiling (about 30cm) in the form of coiling, so that the wiring can be adjusted in the future.

      7. The high-voltage metering cabinet should be equipped with a split-phase voltmeter, and the connecting wire of the voltmeter should be a soft wire to distinguish it from the metering secondary circuit wire.

      Sixth, the design and installation of the electric energy meter box

      1. There should be a space of 8-10cm between the bottom of the electric energy meter box and the lower edge of the joint junction box to the lower edge of the joint junction box.

      2. The size of the electric energy meter box should ensure the space of two meter points, the electric energy meter is installed on one side, and the meter position on the other side is reserved for the remote meter reading terminal equipment, and the depth of the electric energy meter cabinet is not less than 16 cm.

      3. The size of the window of the electric energy meter box should be able to meet the needs of copying the electric energy meter electricity and parameters.

      4. The backrest bottom plate of the electric energy meter should be convenient for the front installation and replacement of the electric energy meter, and meet the insulation and flame retardant requirements.

      5. Other components unrelated to the electric energy meter and remote meter reading terminal equipment shall not be combined with the electric energy meter.

      6. On both sides of the front of the bottom plate of the measuring cabinet, a cable hole with a diameter of 5 cm should be left for each negative pipe device.

      7. The instrument box of the inlet cabinet should be preset with a joint junction box, and the current line bow f is from the secondary side of the current transformer of the inlet cabinet; On the panel adjacent to the meter box and the metering cabinet energy meter box, a cable hole with a diameter of 2.5 cm is reserved to make the two boxes penetrate.


High - pressure metering cabinet

Scan QR code and share on WeChat

Terms Regarding Personal Information and Privacy Protection

×

Important Notice

1. This page is created by the advertiser or its service provider (hereinafter referred to as the "Advertiser"). Tencent Advertising, as a neutral technology service provider, only collects and processes your personal information on behalf of the Advertiser based on the Advertiser's authorization and instructions. Any issues arising from the Advertiser's collection and processing of your personal information, as well as any functions or services provided by the Advertiser, shall be handled by the Advertiser, who shall bear all corresponding legal responsibilities. Please carefully read the Personal Information and Privacy Protection Agreement displayed by the Advertiser on this page (the specific title shall prevail as actually displayed) and ensure that you fully understand and agree to its contents before submitting your information.

2. If you have any questions regarding the Advertiser's collection and processing of your personal information, you may contact ads_service@tencent.com by email to obtain the Advertiser's contact information.

Personal Information and Privacy Protection Agreement

Dear User,

1. This service page and this Agreement are provided by Zhejiang Dexuan Technology Co., Ltd. (hereinafter referred to as "we", "us", or "our").

2. We will collect and process your personal information in accordance with the provisions of this Agreement. This Agreement may contain important terms relating to your personal information rights and interests. Please read it carefully before providing any personal information. Once you submit the relevant information on this page, you shall be deemed to have read, understood, and agreed to all the terms of this Agreement.

3. In order to further provide you with information related to our products or services, understand your needs to better achieve the promotional purposes of this advertisement, and facilitate participation in related marketing activities (such as prize draws or coupon distribution), you may be required to submit relevant information through the forms on this page (hereinafter referred to as "Customer Information"). We undertake to collect and process the information you provide in strict compliance with applicable laws and regulations. You have the right to refuse to provide such information; however, this may prevent you from receiving further advertising information or related services. If you choose to provide such information, you shall ensure that all information submitted is true, accurate, complete, and valid.

4. If this service page involves recommending nearby stores or service locations, you may choose to manually select a nearby location or authorize us or Tencent Advertising to obtain your geolocation information (such as GPS information, WLAN access point information, etc.) in order to automatically display nearby stores or service locations on this page. The geolocation information requested on this page will only be used for the purpose of displaying nearby store information during the current session. If you do not agree to authorize access to your geolocation information, you may select "Decline." In such case, we will not automatically recommend nearby stores, but this will not affect your normal use of other functions and services. We may only display potentially relevant content or services based on network information (such as your IP address), and you may manually complete the relevant information selection.

5. You agree that we may collect and/or process your personal information, either directly or through entrusted third parties, for the following purposes. Such third parties may include, but are not limited to, our distributors, advertising service partners, customer service providers, and data analysis service providers:

(1) To arrange for our sales representatives to contact you and provide you with more valuable information in order to fulfill advertising and promotional purposes;

(2) To support advertising business cooperation activities, including advertising delivery, advertising performance optimization, attribution analysis, and advertising monitoring;

(3) To conduct commercial analysis and gain business insights;

(4) To verify the authenticity of the information provided;

(5) To enable automatic form completion functions: for your convenience, if you choose to use this feature, we may locally store the information you voluntarily provide. When you visit our advertising pages again and need to fill in similar information, we may help you automatically populate the form using the most recently saved information you have authorized us to retain. You may modify such pre-filled information at any time. No such information will be transmitted externally before you click the submit button;

(6) To facilitate the display and interactive functions of this service page;

(7) To send relevant notifications and reminders;

(8) For other purposes permitted by applicable laws and regulations. We will require these third parties to protect your personal information in accordance with security standards that are no less stringent than our own.

6. We will take effective measures to safeguard the security of your personal information. Any issues arising from the collection and processing of your personal information by us or our entrusted third parties shall be handled by us, and we shall bear the corresponding responsibilities.

7. If you are under the age of 18, please read this Agreement together with your parents or other legal guardians under their supervision and guidance.

8. If you have any complaints, suggestions, inquiries, or requests regarding your rights under applicable laws and regulations, including but not limited to requests for access, correction, deletion, or withdrawal of consent, please contact ads_service@tencent.com to obtain our contact information.

Zhejiang Dexuan Technology Co., Ltd.